Per ordinance 2018-0-026 effective April 1,2018, water rates also include a fixed monthly water demand fee based on meter size. This fee is applicable to water, Irrigation, Fire hydrant, Agriculture, Industrial and Temporary construction meters.
Meter Size in Inches | Proposed Fixed Fees/Month |
---|---|
5/8 and 3/4 | $1.00 |
1 and 11/2 | $2.00 |
2 | $6.00 |
3 | $8.00 |
4 | $15.00 |
6 and 8 | $50.00 |